
PIAA EASTERN CONFERENCE 1A-2A CHAMPIONSHIP EXECUTIVE EDUCATION 34 HOLY CROSS 8 SCOTTY WOOD STADIUM, MUHLENBERG COLLEGE. Crawford, who rushed for 193 yards score from fifteen yards out pretty much put the game out of reah by halftime as the Rovers trailed 30-7 at intermission. A Zeyad Ragab 22 yard field goal and a pass from Taylor to Ethan Neidig made it 24-0. A Deante Crawford touchdown run, followed by a Brian Taylor pass to Owen Johnson put the Pats up 14-0. On Friday was another rematch from earlier in the season between the Red Rovers and the Patriots, and much like the first game Freedom won 31-17, this game was a no-contest as the Patriots dismantled the Rovers 44-17. PIAA DISTRICT XI 6A QUARTERFINAL BETHLEHEM FREEDOM 44 EASTON 14 BASD STADIUM Behind the running of Kael Godsahalk’s 295 yards and along with quarterback Eric Striba, who combined for five touchdowns in the win. A rematch of a regular season contest that was won by the Panthers 29-22. My first ever trip to Paul Farnan field in Bangor to witness the Slaters capture the Championship with a 49-14 rout over Saucon Valley. Hollywood attended four District XI playoff games this past weekend, including a Thursday night Eastern Conference 4A Championship. PIAA EASTERN CONFERENCE 4A CHAMPIONSHIP BANGOR 49 SAUCON VALLEY 14

I also removed all the nails and old pipe hangers left from old mechanicals.A Review of the This Past Weekend’s Playoff Games in District XI and a Look Ahead to Five District Championships This Upcoming Weekend. I found none, but I would have used end nippers and cut them flush with the subfloor. Once complete I checked the subfloor above for any penetrating nails that would inhibit the new joist. These items would all need to be replaced after sistering the joist. I also had to pull wire staples and unscrew conduit and heating pipe supports. This necessitated shutting off the electricity and disconnecting a smoke alarm and some thermostat wiring. The first step was to temporarily remove or relocate the electrical cables and pipes. I also found old nails and pipe brackets, left in place from years past-I hate that. I had a few obstructions in my way there were electrical wires, thermostat cables, a refrigerator water line, electrical conduit and heating pipes in the area. After cutting to length, I then ripped the new joist to fit. I used a circ saw to cut the new joist so it would sit 3 inches on top of the beam. The length of the new joist was cut so the end fit 3″ over the support beam. Framing lumber or laminated lumber if needed for strength.

Structural screws and joist hangers if applicable.
Cutting room floor patches cracked#
To make matters worse, the refrigerator above our joist was causing the floor to sag.Ī severely, cracked or sagging floor joist can get worse over time, causing the floor above it to slope or become unleveled. Not only did the aggressive notching doom this joist, it affected the structural integrity of the floor system above.

Today, this type of notch is not allowed by code. My guess is that many years back, an old vent or furnace pipe ran through this location, and the contractor needed to cut this section of joist to accomplish the installation. Corbeling was done for decoration or to support structural beams, like in this situation. Improper notching can weaken a floor joist.Ĭorbeling is an “old school,” overlapping arrangement of bricks with each course extending farther out from the vertical of the wall than the course below.
